Page 132 - Porto da Beira/Port of Beira
P. 132

130INFORMAÇÕES DO PORTOPORT INFORMATIONTransport InfrastructureAirportBeira Airport, 12 km from the port, has scheduled air services to Maputo, Harare (Zimbabwe) and Johannesburg (RSA).RoadBeira is 319km by road from the Zimbabwe border at Machipanda and 685km from Malawi via Nova Vanduzi.RailThe Port of Beira is rail-connected through Mozambique Ports and Railways – Portos e Caminhos de Ferro de Moçambique (CFM). The Machipanda Line connects to Zimbabwe and Zambia. The Sena line linking Beira with the Tete Province and Malawi is currently being rehabilitated.FerryA ferry service operates to other small harbours along the Mozambique coast, including Buzi, Sofala, Chiloane, Machanga, Nova Mambone.PipelineAn oil pipeline runs from the Port of Beira to Feruka Oil Refinery in Mutare, Zimbabwe.Port FacilitiesThe Port of Beira has 12 berths stretching over a total length of 1,994m, excluding berth number 1, which is used as a fishing harbour. The port has a Container Terminal and a General Cargo Terminal, both of which are operated by concessionaire Cornelder de Moçambique, as well a facility for handling liquid bulks.Cornelder de Moçambique utilises a computerised Port Management System, offering clients real-time cargo status information via the internet.Multi Purpose Container TerminalThe Multi Purpose Container Terminal encompasses 645m of berth length (Berths 2, 3, 4 and 5) and has a design capacity of 100,000 teus per year.• 200,000m2 container yard, accommodating 3,117 teus• 144 electrical reefer points• dedicated IMDG dangerous goods storage area• 8,400 m2 secure bonded transit warehouse for stuffing andstripping containers• 3,650 m2 covered storage area• Dedicated granite storage areaCargo Handling EquipmentEquipment QuantityShip to shore gantry cranes 4 Rail-mounted transtainer 1 Mobile cranes 2 Reach stackers 14 Empty Container Handlers 4 Large forklifts 3 Small forklifts 14 Timber loader 1 Bagging units – grain 4 Bagging units – fertilizer 2 Terminal Tractors 35 Weighbridge 1Capacity40T (50T hook lift) 40T (50T hook lift) 35T & 45T45T7-10T 32-45T 3-10T12T 325MT/WWD 325MT/WWD 60TPERFIL E DIRECTÓRIA DO PORTO DA BEIRA 2015 | 2016Emergency Generator*WWD = Weather Working DayGeneral Cargo Terminal1 1600 KVAThe General Cargo Terminal covers 670m of berth length (Berths 6, 7, 9 and 10) and has a design capacity of 2,300,000 metric tons per year.• Five covered warehouses totalling 15,000m2• 12,000 m2 paved open space for ferrochrome, granite, steeland other break bulk cargoes• 175,000 m2 storage extension area for expansionOil TerminalThe Port of Beira’s oil terminal encompasses Berths 11 and 12. Berth 11 handles heavy oils and can accommodate tankers up to 20,000 DWT. It is equipped with a pipeline system (4 x 12 inch for unloading, 6 x 8 inch for loading) with a capacity of 400 tonnes per hour.Berth 12, located further upstream, handles refined products such as diesel, petrol, aviation fuel (Jet A1 & Avgas) and fuel oil and can accommodate tankers up to 60,000 DWT. This terminal has an annual capacity of 2.5 million tonnes.


































































































   130   131   132   133   134